Electrical
Test results checked on site, not at the desk weeks later
Electricians photograph the tester display and the finished installation. Your AI agent reads every value, compares it with the limits you set and the drawing, and tells you right away when something does not fit, while the electrician is still on site.
- Insulation resistance8 circuits within your limits
- RCD trip timeWithin your limits, read from the tester
- Circuit 9No test photo yet
- Distribution boardLabel for circuit 7 missing
Drafted a task for Tom Fischer to test circuit 9 and label circuit 7 before he leaves. It waits for your OK.
What changes when your AI agent does the checking
- BeforeWith your AI agent
- Test values are copied by hand from the tester into the report.A photo of the display is enough. Your AI agent reads the value.
- Mistakes in the test report show up at handover.Your AI agent checks every value while the electrician is still on site.
- Nobody checks whether every circuit was actually tested.Your AI agent compares the tested circuits with the plan and asks for the missing ones.
- Years later nobody knows what is behind a wall.Ask your AI agent and get the photos from before the wall was closed.
Checked before the wall is closed
Once the plasterboard is on, nobody can check the wiring again. Your AI agent compares the photos with the drawing you gave it and asks about every difference first. The photos stay in your record, so years later you can still ask what is behind that wall.
What you tell your AI agent
When photos of an open wall come in, compare them with the drawing I gave you. Ask the electrician about every difference before the drywall crew starts.
| Drawing | Photo | |
|---|---|---|
| Sockets | 6 | 6 |
| Cooker outlet | 1 | 1 |
| Switch at the door | 1 | Not in the photo |
| Conduit to hallway | 2 | 2 |
Asked Tom Fischer about the switch before the drywall crew starts at 13:00.
Lockout on record before work starts
Before work starts, your AI agent asks for a photo of the locked breaker and of the voltage tester. It checks that both are there and readable, and asks again if not. The electrician on site decides when it is safe to start.
What you tell your AI agent
Before work starts on a unit, ask for a photo of the locked breaker and of the voltage tester. If either is missing or not readable, ask again.
- Task07:58completedUnit 12: lockout before work starts
Before you start, photograph the locked breaker and the voltage tester.
PhotoLocked breakerBreaker with lockPhotoVoltage tester displayVoltage tester, blurry - Subtask08:04completedSharper photo of the voltage tester
The lock is visible, but the voltage tester display is not readable.
PhotoClose-up of the voltage testerVoltage tester showing 0 V
Lock and 0 V reading are both readable. Saved with the job at 08:12.
Ready for handover, or not
Ask whether a unit is done and get a straight answer, with what is missing and who has it.
Almost. 8 of 9 circuits are tested and within your limits. Circuit 9 has no test result yet, and the label for circuit 7 is missing on the board.
Both are with Tom Fischer. I asked him at 14:05.
Should I draft the test report for you to check once circuit 9 is in?
What Simplepush does on its own
Simplepush has no AI of its own. This part works from the first day, with or without an AI agent.
- Sends each task to a person's phone, with a deadline if you set one
- Shows who answered, who declined and why
- Keeps every answer, photo, voice note and file with who sent it, when and where
- Lets your team search it in the dashboard, and your AI agent read it through the connector
Who runs the checks and schedules?
Your own AI agent, in its own subscription, which is not included in the Simplepush price. A check at 15:00 or a report at 18:00 is a scheduled run in your agent, which sends and reads through Simplepush.
Simplepush does not send on a schedule by itself, so your agent needs to support scheduled runs.
Your AI agent checks. You decide.
Your AI agent
- Reads every tester photo
- Finds circuits not tested yet
- Drafts the test report
You
- Decide when it is safe to work
- Sign the test report
- Approve anything sent to the client
Copy this into your AI agent
Check today's test results
Every weekday at 15:00, look at today's tester photos. Read each value and compare it with the limits in the document I gave you. List values close to a limit and circuits on the plan without a test photo, and ask the electrician for a retest before they leave.
Paste it into your AI agent with the Simplepush connector set up. How to connect your AI agent
What electrical teams use it for
Installation tests
Values read from tester photos and checked on the spot.
Lockout record
Photo of lock and voltage tester saved before work starts.
Before the wall closes
Wiring compared with the drawing while it can still be changed.
Circuit schedule
Written from the photo of the labeled board and compared with the plan.
As-built photos
Every board and cable route photographed. Ask later what is behind any wall.
Handover documents
Test report drafted from the photos, ready for your signature.
See it with your own crew
Book a 30-minute demo and we walk you through Simplepush with your own sites in mind.